Bathroom 2

Economical option. Not necessarily complete bathroom refurbishment. It is enough to update the bathroom part and make it unique. Estimated Work Description Demolition (basin, toilet, glass panels) Basin and toilet Tiling the walls Replacing Bathtub Faucet Stems (new mixer Connector 2 Function shower, bath ) Installing a new toilet Installing a new basin, tap Fitting.

Economical option. Not necessarily complete bathroom refurbishment. It is enough to update the bathroom part and make it unique.

Estimated Work Description:

  • Demolition (basin, toilet, glass panels) Basin and toilet
  • Tiling the walls
  • Replacing Bathtub Faucet Stems (new mixer Connector 2 Function shower, bath )
  • Installing a new toilet
  • Installing a new basin, tap
  • Fitting a bath screen
  • New silicone on tiles
  • Shower head rail slider
  • New cistern toilet
  • 2 New mirrow doors.
  • Rubbish collection and delivering new materials

Total laubour work incl. material 1850£
work was completed 4 days